IDÉLLO

Overview
IDÉLLO had nearly 15,000 pieces of educational content for French Canadian teachers and students. The problem wasn't the content, it was finding it. Teachers with limited planning time were giving up before they found what they needed, and a platform built to support French education in Canada was falling short of its potential.
TFO brought me in as the sole designer to fix that. What followed was an 8-month end-to-end redesign — research, workshops, IA, UI, testing, and handoff — that touched every part of the experience.
My Role
UX/UI Designer — Research, Workshop Facilitation, Wireframes, Design System, Prototyping, User Testing
The Team
Solo Designer working with 1 Director of Product, 1 Product Manger, 1 Analytics Specialist, and 4+ Engineers
Timeline
~ 8 Months for initial MVP launch
Overview
IDÉLLO had nearly 15,000 pieces of educational content for French Canadian teachers and students. The problem wasn't the content, it was finding it. Teachers with limited planning time were giving up before they found what they needed, and a platform built to support French education in Canada was falling short of its potential.
TFO brought me in as the sole designer to fix that. What followed was an 8-month end-to-end redesign — research, workshops, IA, UI, testing, and handoff — that touched every part of the experience.
My Role
UX/UI Designer — Research, Workshop Facilitation, Wireframes, Design System, Prototyping, User Testing
The Team
Solo Designer working with 1 Director of Product, 1 Product Manger, 1 Analytics Specialist, and 4+ Engineers
Timeline
~ 8 Months for initial MVP launch
Overview
IDÉLLO had nearly 15,000 pieces of educational content for French Canadian teachers and students. The problem wasn't the content, it was finding it. Teachers with limited planning time were giving up before they found what they needed, and a platform built to support French education in Canada was falling short of its potential.
TFO brought me in as the sole designer to fix that. What followed was an 8-month end-to-end redesign — research, workshops, IA, UI, testing, and handoff — that touched every part of the experience.
My Role
UX/UI Designer — Research, Workshop Facilitation, Wireframes, Design System, Prototyping, User Testing
The Team
Solo Designer working with 1 Director of Product, 1 Product Manger, 1 Analytics Specialist, and 4+ Engineers
Timeline
~ 8 Months for initial MVP launch
wb_sunny
Highlights
Making resources easier to find to save teachers some planning time